Catford Green marketing suite

Completed in just 8 weeks, the Catford Green marketing suite project involved the complete strip out and refurbishment of an existing modular structure for Barratt London.

The marketing suite construction at Catford Green represents phase one of the redevelopment of Catford Stadium, a landmark regeneration scheme being delivered in partnership between The Mayor of London, Barratt London and Lewisham Borough Council which will ultimately see an 11.6 acre site transformed into a development delivering a mixture of new homes, commercial floor space and a community centre.

With a brief to utilise an existing modular structure for the third time, Octink's marketing suite capability was challenged to ensure a careful strip out and re-build that would deliver a prestige selling space for one of London's leading residential developers . . . all complete and ready to open in just 8 weeks!

The refurbishment involved the creation of a replica show apartment, selections area, and meeting room on the first floor, while the ground floor with bespoke handmade furniture, display graphics, and interactive zone completed the sales floor. Externally the entire building envelope was wrapped in a white aluminium composite cladding system to provide the building with standout kerb appeal.